Get in touch with us!
We seek to create long-term relationships built on results. See how your business can benefit with BNH Gas Tanks on Your team.
Engineering, Procurement and Construction, Installation and Commissioning (EPC) Works New addition in JET A-1 Aviation Turbine Fuel (ATF) Fuel facility and scope of BNH Gas Tanks consists of Detailed Design Procurement, Construction, Testing, Installation and Commissioning as per NFPA 30 consisting of Two (2 Nos.) Aboveground Internal Floating Roof Storage Tank of 5,000 KL Capacity each for Jet A1 (Aircraft Turbine Fuel) as per API 650 such as floating suction, level gauges etc., Plant Process Piping for receiving and transfer of Jet A1 as per ASME B31.3, Pipeline for receiving and transfer from Jetty to Storage Facility as per ASME B31.4, Process Pumps
for Jet A1, Filtration System for Jet A1, 2-Bay Gantry for refueller / bowser loading / unloading, Control & Monitoring Equipments such as Valves (Manual & Remote operated), Metering Skids etc., Complete Civil Foundation of Tanks and associated Civil Structures including Dyke / Bund Wall, Pump Shed, Gantry Structure, Supports for Piping, Electrical, Lighting and other associated structures, Complete Electrical Equipments and Systems including MCC Panels, UPS, Cabling, Lighting and other associated electrical works, Complete Instrumentation Equipment and Systems including PLC for monitoring operations, inventory, safety interlocks, fire detection, fire protection, and firefighting, Firefighting system consisting of engine driven pumps, electrical pumps, jockey pump, deluge, bund pourer, foam system and complete piping with monitors, hydrants, spray nozzle, sprinkler system, detection line as per NFPA 13 & NFPA 15 and Instrument Air System with Air compressor and associate piping.
Interested In More Projects?We seek to create long-term relationships built on results. See how your business can benefit with BNH Gas Tanks on Your team.